This system not far from York was installed over two separate meter points, fully utilising the maximum available connection to allow the client the highest possible amount of renewable generation. Export restrictions from the DNO mean this site will use almost 100% of the renewable energy generated on site.
The nursery, which grows growing bedding and potting plants from seedlings ready to dispatch the large garden centres across throughout the local area, has a high demand on water pumping and irrigation systems as well as a high heating demand through the winter and into spring.